IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0062 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,171 $780 Implemented
OD0062 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,512 $8,748 Implemented
OD0062 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $25,196 $0 Not Implemented
UF0126 # 08 Y:1995 08 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,181 $84,000 Not Implemented
UF0126 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $72,554 $0 Not Implemented
UF0126 # 06 Y:1995 06 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,503,626 $4,550,000 Not Implemented
UF0126 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,132 $2,000 Implemented
UF0126 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,087 $149,527 Not Implemented
UF0126 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $46,162 $114,584 Implemented
UF0126 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,683 $18,125 Not Implemented
UF0126 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,672 $9,944 Not Implemented
OD0029 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,168 $5,356 Not Implemented
OD0029 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,341 $5,389 Not Implemented
OD0029 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $582 $360 Implemented
OD0029 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,739 $1,895 Not Implemented
OD0029 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,457 $1,773 Not Implemented
OD0029 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,463 $800 Implemented
UF0093 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,824 $990 Implemented
UF0093 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,107 $2,459 Not Implemented
UF0093 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,040 $4,519 Not Implemented
UF0093 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $20,100 Not Implemented
UF0093 # 05 Y:1994 05 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,894 $1,496 Implemented
UF0093 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $917 $64 Implemented
UF0093 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $879 Not Implemented
UF0093 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $183 $15 Implemented