IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

374

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0150 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,229 $2,995 Implemented
UA0150 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,421 $49,673 Not Implemented
OR0658 # 01 Y:2015 01 2015 MODIFY CURRENT INCENTIVE PROGRAM $22,712 $60,000 Not Implemented
OR0658 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $680,062 $427,000 Implemented
OR0658 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,203 $59,203 Implemented
OR0658 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,781 $0 Not Implemented
WM0050 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,104 $8,000 Not Implemented
WM0050 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $357 $0 Not Implemented
WM0050 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,875 $1,800 Not Implemented
WM0050 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,029 $0 Not Implemented
WM0050 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $887 $1,575 Not Implemented
WM0050 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,302 $2,100 Not Implemented
WM0050 # 07 Y:2014 07 2014 SELL COMBUSTIBLE WASTE $39,202 $97,000 Not Implemented
WM0050 # 08 Y:2014 08 2014 UPGRADE CONTROLS ON COMPRESSORS $1,111 $0 Not Implemented
OR0638 # 07 Y:2014 07 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,180 $10,000 Implemented
OR0638 # 02 Y:2014 02 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,255 $27,375 Not Implemented
OR0638 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,008 $9,020 Not Implemented
OR0638 # 04 Y:2014 04 2014 MINIMIZE WATER USAGE $1,003 $0 Implemented
OR0638 # 06 Y:2014 06 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,207 $13,800 Not Implemented
OR0638 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,466 $8,550 Not Implemented
OR0638 # 01 Y:2014 01 2014 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $237,276 $62,840 Not Implemented
NC0512 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $560 Not Implemented
NC0512 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $642 $944 Not Implemented
NC0512 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $1,605 Not Implemented
NC0512 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,636 $43,944 Not Implemented