Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 2435 | Hardwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0564 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM THICKNESS INSULATION | $64,658 | $105,222 | Implemented |
OR0564 # 01 Y:2010 | 01 | 2010 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $11,375 | $32,340 | Not Implemented |
OR0564 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $7,248 | $31,290 | Not Implemented |
OR0564 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $9,666 | $40,000 | Not Implemented |
OR0564 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,314 | $31,314 | Implemented |
OR0564 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,849 | $7,575 | Not Implemented |
OR0555 # 01 Y:2010 | 01 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $257,883 | $405,450 | Not Implemented |
OR0555 # 03 Y:2010 | 03 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,978 | $11,900 | Implemented |
OR0555 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,054 | $1 | Implemented |
OR0555 # 02 Y:2010 | 02 | 2010 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $32,115 | $37,100 | Not Implemented |
WV0399 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,889 | $0 | Implemented |
WV0399 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,246 | $26 | Not Implemented |
WV0399 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,812 | $0 | Implemented |
WV0399 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $154,014 | $106,000 | Not Implemented |
WV0399 # 03 Y:2010 | 03 | 2010 | COVER OPEN TANKS | $83,144 | $7,290 | Implemented |
WV0399 # 08 Y:2010 | 08 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,515 | $1,717 | Implemented |
WV0399 # 11 Y:2010 | 11 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,309 | $4,560 | Not Implemented |
WV0399 # 09 Y:2010 | 09 | 2010 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,930 | $1,000 | Implemented |
WV0399 # 05 Y:2010 | 05 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $18,121 | $1,644 | Implemented |
WV0399 # 01 Y:2010 | 01 | 2010 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $215,411 | $540,000 | Not Implemented |
WV0399 # 13 Y:2010 | 13 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,498 | $4,153 | Not Implemented |
WV0399 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $2,955 | $3,544 | Implemented |
WV0399 # 04 Y:2010 | 04 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,930 | $39,900 | Implemented |
OR0548 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,000 | $8,800 | Not Implemented |
OR0548 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,295 | $0 | Implemented |