Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 2435 | Hardwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0050 # 08 Y:2014 | 08 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $1,111 | $0 | Not Implemented |
WM0050 # 07 Y:2014 | 07 | 2014 | SELL COMBUSTIBLE WASTE | $39,202 | $97,000 | Not Implemented |
WM0050 # 06 Y:2014 | 06 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,302 | $2,100 | Not Implemented |
WM0050 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $887 | $1,575 | Not Implemented |
WM0050 # 04 Y:2014 | 04 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,029 | $0 | Not Implemented |
WM0050 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,875 | $1,800 | Not Implemented |
WM0050 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $357 | $0 | Not Implemented |
WM0050 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,104 | $8,000 | Not Implemented |
OR0638 # 05 Y:2014 | 05 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,008 | $9,020 | Not Implemented |
OR0638 # 07 Y:2014 | 07 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,180 | $10,000 | Implemented |
OR0638 # 06 Y:2014 | 06 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,207 | $13,800 | Not Implemented |
OR0638 # 04 Y:2014 | 04 | 2014 | MINIMIZE WATER USAGE | $1,003 | $0 | Implemented |
OR0638 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,466 | $8,550 | Not Implemented |
OR0638 # 01 Y:2014 | 01 | 2014 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $237,276 | $62,840 | Not Implemented |
OR0638 # 02 Y:2014 | 02 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,255 | $27,375 | Not Implemented |
NC0512 # 02 Y:2014 | 02 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,621 | $0 | Not Implemented |
NC0512 # 03 Y:2014 | 03 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,504 | $22,000 | Not Implemented |
NC0512 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,341 | $100 | Not Implemented |
NC0512 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,361 | $100 | Implemented |
NC0512 # 06 Y:2014 | 06 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $36,114 | $73,589 | Not Implemented |
NC0512 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $35,127 | $9,720 | Not Implemented |
NC0512 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,636 | $43,944 | Not Implemented |
NC0512 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $375 | $1,605 | Not Implemented |
NC0512 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $642 | $944 | Not Implemented |
NC0512 # 11 Y:2014 | 11 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $440 | $560 | Not Implemented |