Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
345
matching recommendationsSIC | 2436 | Softwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0447 # 04 Y:2003 | 04 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,460 | $880 | Implemented |
WV0267 # 12 Y:2003 | 12 | 2003 | MINIMIZE WATER USAGE | $6,675 | $4,000 | Implemented |
WV0267 # 11 Y:2003 | 11 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $684 | $250 | Implemented |
WV0267 # 10 Y:2003 | 10 | 2003 | OPTIMIZE PLANT POWER FACTOR | $2,644 | $12,320 | Not Implemented |
WV0267 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,148 | $1,475 | Implemented |
WV0267 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,946 | $0 | Implemented |
WV0267 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,920 | $1,125 | Implemented |
WV0267 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $353 | $395 | Implemented |
WV0267 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,185 | $135 | Implemented |
WV0267 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,402 | $30 | Implemented |
WV0267 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $582 | $150 | Implemented |
WV0267 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,522 | $2,820 | Not Implemented |
WV0267 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,580 | $0 | Not Implemented |
OR0430 # 01 Y:2003 | 01 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $119,450 | $176,200 | Not Implemented |
OR0430 # 02 Y:2003 | 02 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $129,340 | $12,250 | Not Implemented |
OR0430 # 03 Y:2003 | 03 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $11,900 | $9,300 | Not Implemented |
OR0430 # 04 Y:2003 | 04 | 2003 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $30,700 | $17,700 | Implemented |
OR0430 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,810 | $9,000 | Implemented |
OR0430 # 06 Y:2003 | 06 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $11,350 | $2,000 | Implemented |
OR0430 # 07 Y:2003 | 07 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,950 | $3,100 | Not Implemented |
OR0430 # 08 Y:2003 | 08 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,830 | $14,600 | Implemented |
OR0430 # 09 Y:2003 | 09 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,840 | $1,270 | Implemented |
OR0430 # 10 Y:2003 | 10 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $816 | $0 | Not Implemented |
OR0430 # 11 Y:2003 | 11 | 2003 | ELIMINATE/REDUCE AN OPERATION | $17,160 | $16,900 | Not Implemented |
OR0427 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,750 | $81,000 | Not Implemented |