Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
267
matching recommendationsSIC | 2436 | Softwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0761 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,913 | $1,078 | Implemented |
OR0761 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,236 | $26,406 | Not Implemented |
OR0761 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,934 | $9,934 | Implemented |
OR0761 # 04 Y:2022 | 04 | 2022 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $31,013 | $150,000 | Not Implemented |
UA0260 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $90,617 | $35,347 | Implemented |
UA0260 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $429,299 | $2,825,211 | Not Implemented |
UA0260 # 04 Y:2022 | 04 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $230,787 | $328,350 | Not Implemented |
UA0260 # 02 Y:2022 | 02 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,710 | $1,651 | Implemented |
UA0260 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,000 | $1,784 | Not Implemented |
UA0260 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,881 | $1,000 | Not Implemented |
UA0259 # 03 Y:2022 | 03 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $100,047 | $47,295 | Not Implemented |
UA0259 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $225,594 | $969,631 | Not Implemented |
UA0259 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,827 | $1,000 | Implemented |
UA0259 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $50,082 | $26,090 | Implemented |
UA0259 # 02 Y:2022 | 02 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,057 | $2,063 | Not Implemented |
OR0727 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,255 | $770 | Implemented |
OR0727 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,870 | $19,006 | Implemented |
OR0727 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,245,906 | $300,000 | Not Implemented |
OR0727 # 02 Y:2019 | 02 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $125,609 | $904,500 | Not Implemented |
NC0532 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $353 | $438 | Implemented |
NC0532 # 07 Y:2015 | 07 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,753 | $1,620 | Implemented |
NC0532 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,952 | $100 | Not Implemented |
NC0532 # 11 Y:2015 | 11 | 2015 | REDUCE FLUID FLOW RATES | $8,338 | $5,000 | Not Implemented |
NC0532 # 12 Y:2015 | 12 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,924 | $1,935 | Not Implemented |
NC0532 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $17,917 | $8,000 | Not Implemented |