Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
165
matching recommendationsSIC | 2448 | Wood Pallets And Skids |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0525 # 01 Y:2022 | 01 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $66,619 | $458,235 | Not Implemented |
AS0525 # 05 Y:2022 | 05 | 2022 | APPLY FOR INVESTMENT INCENTIVES | $17,475 | $500 | Implemented |
AS0525 # 07 Y:2022 | 07 | 2022 | USE PHOTOCELL CONTROLS | $894 | $144 | Not Implemented |
AS0525 # 08 Y:2022 | 08 | 2022 | MAINTAIN MACHINES TO REDUCE LEAKS | $705 | $1,992 | Implemented |
AS0525 # 02 Y:2022 | 02 | 2022 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $32,935 | $15,560 | Implemented |
AS0525 # 03 Y:2022 | 03 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $22,011 | $1,900 | Implemented |
AS0525 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,862 | $6,763 | Implemented |
AS0525 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,910 | $12,950 | Implemented |
LE0525 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,480 | $20,000 | Not Implemented |
LE0525 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,698 | $5,000 | Not Implemented |
LE0525 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $150 | Implemented |
LE0525 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $108,808 | $250,000 | Not Implemented |
LE0525 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $763 | $2,001 | Implemented |
LE0525 # 05 Y:2022 | 05 | 2022 | BURN WOOD BY-PRODUCTS FOR HEAT | $41,476 | $130,000 | Not Implemented |
UA3029 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $24,921 | $9,630 | Not Implemented |
UA3029 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,059 | $800 | Implemented |
UA3029 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,101 | $907 | Not Implemented |
UA3029 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,023 | $330 | Implemented |
UA3029 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $858 | $1,060 | Implemented |
UA3029 # 02 Y:2013 | 02 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,202 | $7,598 | Not Implemented |
SF0421 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,912 | $0 | Not Implemented |
SF0421 # 04 Y:2012 | 04 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,965 | $104,550 | Not Implemented |
SF0421 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,017 | $0 | Implemented |
SF0421 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,494 | $10,564 | Not Implemented |
SF0421 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,801 | $22,991 | Implemented |