IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
Reset
SIC 245 Wood Buildings And Mobile Homes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0478 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $219 $200 Implemented
NC0478 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,874 $1,800 Implemented
NC0478 # 05 Y:2013 05 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $489 $0 Implemented
NC0478 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $1,410 Implemented
BS0003 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,118 $296 Implemented
BS0003 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,528 $300 Implemented
BS0003 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $4,997 Implemented
BS0003 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $1,497 Implemented
BS0003 # 05 Y:2012 05 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $458 $600 Implemented
OR0569 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $17,900 $58,500 Implemented
OR0569 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $517 $517 Implemented
OR0569 # 02 Y:2011 02 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,650 $700 Implemented
OR0569 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $9,149 $450 Implemented
OR0566 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $1,690 Implemented
OR0566 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,340 $9,990 Implemented
OR0566 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,230 $635 Implemented
TT0045 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $48,659 $64,000 Implemented
TT0045 # 01 Y:2009 01 2009 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $100,429 $34,284 Implemented
TT0045 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,434 $45,960 Implemented
DL0040 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $2,331 $2,350 Implemented
DL0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $3,000 Implemented
DL0040 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,533 $38,218 Implemented
DL0040 # 03 Y:2009 03 2009 UPGRADE OBSOLETE EQUIPMENT $3,215 $0 Implemented
AS0413 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,423 $15,000 Implemented
AS0413 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,882 $1,000 Implemented