IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,398

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0622 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $10,631 $10,763 Not Implemented
OR0622 # 03 Y:2013 03 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,423 $20,917 Not Implemented
OR0622 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,279 $15,410 Not Implemented
OR0616 # 01 Y:2013 01 2013 INSTALL SENSORS TO DETECT DEFECTS $145,630 $200 Implemented
OR0616 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $6,100 Implemented
OR0616 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $2,727 $11,025 Not Implemented
OR0616 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $750 Implemented
TT0111 # 01 Y:2013 01 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $6,000 $5,000 Not Implemented
TT0111 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,000 $50,000 Not Implemented
TT0111 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,000 $5,000 Implemented
TT0111 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,000 $4,000 Implemented
TT0111 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,000 $1,500 Implemented
NC0480 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $481 $1,490 Implemented
NC0480 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,008 $4,271 Implemented
NC0480 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $297 $264 Implemented
NC0480 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $1,282 $1,250 Implemented
NC0480 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $100 Implemented
NC0480 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $6,224 $13,210 Implemented
NC0480 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $4,207 $15,472 Not Implemented
WV0466 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,182 $32,900 Not Implemented
WV0466 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $15,207 $35,976 Implemented
WV0466 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,380 $0 Not Implemented
WV0466 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,321 $1,000 Not Implemented
WV0466 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,752 $3,840 Not Implemented
WV0466 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $3,614 $5,600 Not Implemented