IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0211 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,196 $150 Implemented
UA0211 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,287 $791 Not Implemented
UA0211 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,928 $100 Not Implemented
UA0211 # 07 Y:2019 07 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $374,108 $1,310,277 Implemented
UA0211 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,492 $1,345 Not Implemented
UA0211 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $639 $1,455 Not Implemented
UA0211 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,405 $24,659 Not Implemented
UA0211 # 09 Y:2019 09 2019 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,027,932 $1,000,000 Not Implemented
UA0211 # 06 Y:2019 06 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,787 $16,620 Not Implemented
UA0203 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,053 $200 Implemented
UA0203 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,434 $8,870 Not Implemented
UA0203 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,238 $2,765 Implemented
UA0203 # 02 Y:2019 02 2019 USE PHOTOCELL CONTROLS $1,777 $7,719 Implemented
UA0203 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,597 $23,433 Implemented
UA0203 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $3,682 $2,568 Implemented
UA0203 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $567 $486 Implemented
UA0160 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,685 $1,300 Implemented
UA0160 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $221,404 $94,081 Not Implemented
UA0160 # 02 Y:2016 02 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $85,894 $0 Implemented
UA0160 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83,969 $169,192 Not Implemented
UA0160 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $3,368 $1,162 Not Implemented
UA0160 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,141 $700 Not Implemented
UA0160 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,220 $2,995 Implemented
UA0139 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,460 $2,995 Not Implemented
UA0139 # 01 Y:2015 01 2015 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $63,096 $121,500 Not Implemented