Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 249 | Miscellaneous Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0466 # 13 Y:2013 | 13 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $477 | $470 | Implemented |
WV0466 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,182 | $32,900 | Not Implemented |
WV0466 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $15,207 | $35,976 | Implemented |
WV0466 # 03 Y:2013 | 03 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,380 | $0 | Not Implemented |
WV0466 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,321 | $1,000 | Not Implemented |
WV0466 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,752 | $3,840 | Not Implemented |
WV0466 # 06 Y:2013 | 06 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,614 | $5,600 | Not Implemented |
WV0466 # 07 Y:2013 | 07 | 2013 | BURN WASTE OIL FOR HEAT | $2,530 | $4,000 | Not Implemented |
WV0466 # 08 Y:2013 | 08 | 2013 | IMPROVE LUBRICATION PRACTICES | $2,167 | $1,000 | Implemented |
WV0466 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $488 | Implemented |
WV0466 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,248 | $30 | Implemented |
WV0466 # 11 Y:2013 | 11 | 2013 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,129 | $5,550 | Not Implemented |
WV0466 # 12 Y:2013 | 12 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,001 | $113 | Implemented |
UD0810 # 11 Y:2010 | 11 | 2010 | INSTALL OCCUPANCY SENSORS | $347 | $34 | Not Implemented |
UD0810 # 01 Y:2010 | 01 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,208 | $1,500 | Implemented |
UD0810 # 10 Y:2010 | 10 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $532 | $740 | Not Implemented |
UD0810 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,568 | $0 | Implemented |
UD0810 # 12 Y:2010 | 12 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $200 | $500 | Not Implemented |
UD0810 # 04 Y:2010 | 04 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $5,042 | $2,000 | Not Implemented |
UD0810 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $1,834 | Implemented |
UD0810 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,405 | $2,242 | Implemented |
UD0810 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,614 | $1,000 | Implemented |
UD0810 # 02 Y:2010 | 02 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,919 | $1,000 | Implemented |
UD0810 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,338 | $32,000 | Not Implemented |
UD0810 # 05 Y:2010 | 05 | 2010 | METER WASTE WATER | $4,167 | $1,500 | Not Implemented |