Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 249 | Miscellaneous Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0647 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,658 | $3,635 | Not Implemented |
OK0647 # 10 Y:2002 | 10 | 2002 | INSTALL OCCUPANCY SENSORS | $313 | $395 | Not Implemented |
OK0647 # 09 Y:2002 | 09 | 2002 | INSTALL SET-BACK TIMERS | $1,446 | $372 | Implemented |
OK0647 # 07 Y:2002 | 07 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $166,400 | $208,754 | Implemented |
OK0647 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $11,788 | $9,041 | Implemented |
OK0647 # 08 Y:2002 | 08 | 2002 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $87,000 | $5,400 | Not Implemented |
OK0647 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $42,712 | $2,250 | Implemented |
OK0647 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $29,330 | $9,344 | Implemented |
OK0647 # 03 Y:2002 | 03 | 2002 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $21,369 | $15,150 | Not Implemented |
OK0647 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,412 | $3,349 | Not Implemented |
NC0245 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $142,297 | $262,500 | Not Implemented |
NC0245 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,991 | $1,000 | Not Implemented |
NC0245 # 02 Y:2002 | 02 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,452 | $20,000 | Not Implemented |
NC0245 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $1,590 | Not Implemented |
NC0245 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,574 | $0 | Not Implemented |
NC0245 # 05 Y:2002 | 05 | 2002 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,000 | $6,320 | Not Implemented |
NC0245 # 07 Y:2002 | 07 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $600 | $0 | Not Implemented |
WV0250 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $718 | $230 | Not Implemented |
WV0250 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150 | $0 | Implemented |
WV0250 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $1,387 | $188 | Implemented |
WV0250 # 08 Y:2002 | 08 | 2002 | REPLACE BOILER | $65,563 | $100,000 | Not Implemented |
WV0250 # 09 Y:2002 | 09 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,056 | $3,735 | Not Implemented |
WV0250 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $900 | $665 | Not Implemented |
WV0250 # 11 Y:2002 | 11 | 2002 | CHANGE OPERATING CONDITIONS | $21,375 | $875 | Not Implemented |
WV0250 # 12 Y:2002 | 12 | 2002 | INSTALL SENSORS TO DETECT DEFECTS | $11,505 | $13,600 | Not Implemented |