IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2491 Wood Preserving
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0676 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $2,884 $6,584 Implemented
OR0676 # 05 Y:2016 05 2016 ADD AREA LIGHTING SWITCHES $1,356 $1,062 Implemented
OR0676 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,774 $7,200 Implemented
OR0676 # 03 Y:2016 03 2016 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $216,607 $80,000 Implemented
OR0676 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,729 $6,828 Not Implemented
OR0676 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,742 $0 Not Implemented
OR0572 # 03 Y:2011 03 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $770 $2,280 Not Implemented
OR0572 # 08 Y:2011 08 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,310 $1,170 Not Implemented
OR0572 # 07 Y:2011 07 2011 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,280 $500 Implemented
OR0572 # 06 Y:2011 06 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,030 $14,750 Not Implemented
OR0572 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,070 $4,559 Not Implemented
OR0572 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $4,320 Implemented
OR0572 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,220 $2,280 Not Implemented
OR0572 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $6,860 $3,642 Implemented
OR0450 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,000 $3,400 Implemented
OR0450 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $8,330 $14,250 Not Implemented
OR0450 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $0 Implemented
OR0450 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
OR0450 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,700 $10,000 Implemented
OR0275 # 01 Y:1996 01 1996 REDUCE SCRAP PRODUCTION $3,761 $0 Implemented
OR0275 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $278 $1,091 Implemented
OR0275 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,493 $5,000 Implemented
OR0275 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,894 $500 Not Implemented