IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 2493 Reconstituted Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0466 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,752 $3,840 Not Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0466 # 11 Y:2013 11 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,129 $5,550 Not Implemented
WV0466 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,248 $30 Implemented
WV0466 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $488 Implemented
WV0466 # 08 Y:2013 08 2013 IMPROVE LUBRICATION PRACTICES $2,167 $1,000 Implemented
WV0466 # 07 Y:2013 07 2013 BURN WASTE OIL FOR HEAT $2,530 $4,000 Not Implemented
WV0466 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $3,614 $5,600 Not Implemented
WV0466 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,321 $1,000 Not Implemented
WV0466 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,380 $0 Not Implemented
WV0466 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $15,207 $35,976 Implemented
WV0466 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,182 $32,900 Not Implemented
UD0185 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,827 $54,000 Implemented
UD0185 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,556 $9,700 Not Implemented
UD0185 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,108 $5,100 Not Implemented
UD0185 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,629 $30,202 Implemented