IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2493 Reconstituted Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0647 # 10 Y:2002 10 2002 INSTALL OCCUPANCY SENSORS $313 $395 Not Implemented
OK0647 # 09 Y:2002 09 2002 INSTALL SET-BACK TIMERS $1,446 $372 Implemented
OK0647 # 08 Y:2002 08 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $87,000 $5,400 Not Implemented
OK0647 # 07 Y:2002 07 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $166,400 $208,754 Implemented
OK0647 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,412 $3,349 Not Implemented
OK0647 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $11,788 $9,041 Implemented
OK0647 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $42,712 $2,250 Implemented
OK0647 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $29,330 $9,344 Implemented
OK0647 # 03 Y:2002 03 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $21,369 $15,150 Not Implemented
OK0647 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,658 $3,635 Not Implemented
NC0245 # 02 Y:2002 02 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,452 $20,000 Not Implemented
NC0245 # 07 Y:2002 07 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $600 $0 Not Implemented
NC0245 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $1,590 Not Implemented
NC0245 # 05 Y:2002 05 2002 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,000 $6,320 Not Implemented
NC0245 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,991 $1,000 Not Implemented
NC0245 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,574 $0 Not Implemented
NC0245 # 01 Y:2002 01 2002 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $142,297 $262,500 Not Implemented
OR0406 # 01 Y:2002 01 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $139,631 $27,000 Not Implemented
OR0406 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $50,372 $92,500 Not Implemented
OR0406 # 03 Y:2002 03 2002 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $29,530 $43,240 Not Implemented
OR0406 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,752 $0 Not Implemented
OR0406 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,569 $8,500 Implemented
OR0406 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $12,899 $0 Not Implemented
OR0406 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,215 $60,000 Not Implemented
OR0406 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,027 $3,630 Implemented