Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
641
matching recommendationsSIC | 2499 | Wood Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0305 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,013 | $340 | Implemented |
ME0305 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $1,193 | Implemented |
ME0305 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $366 | $357 | Implemented |
ME0305 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $187 | $350 | Not Implemented |
ME0305 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $325 | $225 | Implemented |
ME0305 # 06 Y:2000 | 06 | 2000 | AUTOMATE FINISHING PROCESS | $15,000 | $41,800 | Implemented |
OR0374 # 01 Y:2000 | 01 | 2000 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $152,880 | $600,000 | Not Implemented |
OR0374 # 02 Y:2000 | 02 | 2000 | USE PHOTOCELL CONTROLS | $2,537 | $1,000 | Not Implemented |
OR0374 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,481 | $18,298 | Implemented |
OR0374 # 04 Y:2000 | 04 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $145 | $500 | Not Implemented |
AS0285 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,166 | $1,549 | Not Implemented |
AS0285 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,526 | $7,394 | Not Implemented |
AS0285 # 03 Y:2000 | 03 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,513 | $960 | Not Implemented |
AS0285 # 04 Y:2000 | 04 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $216,399 | $200,000 | Not Implemented |
AS0285 # 05 Y:2000 | 05 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $3,858 | $120 | Not Implemented |
AS0285 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,339 | $2,000 | Not Implemented |
ME0295 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,961 | $72,500 | Not Implemented |
ME0295 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,533 | $20,900 | Not Implemented |
ME0295 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,918 | $11,100 | Not Implemented |
ME0295 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,043 | $860 | Not Implemented |
ME0295 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,424 | $210 | Not Implemented |
ME0295 # 06 Y:2000 | 06 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,656 | $1,330 | Not Implemented |
ME0295 # 07 Y:2000 | 07 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $815 | $1,600 | Not Implemented |
ME0295 # 08 Y:2000 | 08 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $112 | $130 | Not Implemented |
ME0295 # 09 Y:2000 | 09 | 2000 | MAKE A NEW BY-PRODUCT | $15,041 | $21,330 | Not Implemented |