IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2499 Wood Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0767 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $5,428 Not Implemented
OR0767 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,167 $14,238 Not Implemented
OR0767 # 03 Y:2023 03 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,390 $200,000 Implemented
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
OR0616 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $750 Implemented
OR0616 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $2,727 $11,025 Not Implemented
OR0616 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $6,100 Implemented
OR0616 # 01 Y:2013 01 2013 INSTALL SENSORS TO DETECT DEFECTS $145,630 $200 Implemented
OR0224 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,125 $3,136 Implemented
OR0224 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $270 $900 Not Implemented
OR0224 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $8,365 $3,044 Not Implemented
OR0224 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,929 $8,776 Not Implemented
OR0097 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,511 $27,350 Not Implemented
OR0097 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,093 $4,370 Not Implemented
OR0097 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $345 $693 Not Implemented
OR0097 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $4,999 $5,100 Implemented
OR0097 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,133 $4,200 Implemented
OR0097 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,683 $500 Implemented
OR0064 # 01 Y:1989 01 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $772 $0 Implemented
OR0064 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $1,704 $975 Implemented
OR0064 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $139 Implemented
OR0064 # 03 Y:1989 03 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $559 $175 Not Implemented
OR0064 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $467 $0 Implemented