IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 2499 Wood Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0305 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $15,000 $41,800 Implemented
ME0305 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $325 $225 Implemented
ME0305 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $187 $350 Not Implemented
ME0305 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $366 $357 Implemented
ME0305 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,193 Implemented
ME0305 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $340 Implemented
OR0374 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $145 $500 Not Implemented
OR0374 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,481 $18,298 Implemented
OR0374 # 02 Y:2000 02 2000 USE PHOTOCELL CONTROLS $2,537 $1,000 Not Implemented
OR0374 # 01 Y:2000 01 2000 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $152,880 $600,000 Not Implemented
AS0285 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $1,549 Not Implemented
AS0285 # 05 Y:2000 05 2000 MODIFY STARTUP/SHUTDOWN TIMES $3,858 $120 Not Implemented
AS0285 # 04 Y:2000 04 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $216,399 $200,000 Not Implemented
AS0285 # 03 Y:2000 03 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,513 $960 Not Implemented
AS0285 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,526 $7,394 Not Implemented
AS0285 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,339 $2,000 Not Implemented
ME0295 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,656 $1,330 Not Implemented
ME0295 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,424 $210 Not Implemented
ME0295 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,043 $860 Not Implemented
ME0295 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $11,100 Not Implemented
ME0295 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,533 $20,900 Not Implemented
ME0295 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,961 $72,500 Not Implemented
ME0295 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $112 $130 Not Implemented
ME0295 # 10 Y:2000 10 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $27,000 $1,512 Not Implemented
ME0295 # 09 Y:2000 09 2000 MAKE A NEW BY-PRODUCT $15,041 $21,330 Not Implemented