IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,700

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0230 # 08 Y:1998 08 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,546 $0 Implemented
MO0230 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $63,165 $15,100 Implemented
AR0139 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,835 $710 Implemented
AR0139 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $439 $793 Implemented
AR0139 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,785 $0 Implemented
AR0139 # 06 Y:1998 06 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $11,200 $3,665 Implemented
AR0139 # 07 Y:1998 07 1998 INSTALL MAGAZINES FOR TEMPORARY STORAGE $38,400 $7,000 Implemented
TN0634 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $84,680 $200,000 Implemented
TN0634 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,500 $50,000 Implemented
TN0634 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,720 $2,600 Implemented
TN0634 # 06 Y:1998 06 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,990 $510 Implemented
TN0634 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $1,820 Implemented
TN0634 # 11 Y:1998 11 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $960 Implemented
TN0634 # 12 Y:1998 12 1998 REPAIR AND ELIMINATE STEAM LEAKS $310 $295 Implemented
TN0634 # 13 Y:1998 13 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $500 Implemented
MA0411 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,333 $225 Implemented
MA0411 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $140 $140 Implemented
SF0136 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,673 $0 Implemented
SF0136 # 02 Y:1998 02 1998 ADD AREA LIGHTING SWITCHES $860 $90 Implemented
SF0136 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $233 Implemented
SF0136 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $905 Implemented
SF0136 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,456 $14,990 Implemented
SF0136 # 08 Y:1998 08 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,827 $24,062 Implemented
SF0136 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $151,580 $152,960 Implemented
WV0138 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $2,195 Implemented