IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0559 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,767 $956 Implemented
UF0559 # 02 Y:2020 02 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $19,566 $32,210 Implemented
UF0559 # 08 Y:2020 08 2020 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $5,262 $7,180 Implemented
UF0559 # 05 Y:2020 05 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $3,317 Implemented
UF0559 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,328 $5,468 Implemented
UF0559 # 04 Y:2020 04 2020 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $3,003 $750 Implemented
UF0559 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $602 $0 Implemented
MI0372 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $120 Implemented
MI0372 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $1,980 Implemented
MI0372 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,103 $21,302 Implemented
MI0370 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,663 $120 Implemented
MI0370 # 09 Y:2020 09 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,780 $580 Implemented
MI0370 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,834 $1,980 Implemented
MI0370 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,066 $480 Implemented
MI0370 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,983 $580 Implemented
MI0363 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0363 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,025 $120 Implemented
MI0363 # 08 Y:2019 08 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,001 $240 Implemented
MI0363 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $22,037 $3,600 Implemented
MI0363 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,089 $74,297 Implemented
MI0330 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $794 $1,833 Implemented
MI0330 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $29,294 $1,300 Implemented
MI0330 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,299 $2,670 Implemented
MI0330 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $7,073 $2,875 Implemented
MI0330 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $5,537 $7,669 Implemented