IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0171 # 03 Y:1995 03 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,447 $20,000 Implemented
ME0171 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,073 $1,495 Not Implemented
ME0171 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $957 Not Implemented
ME0171 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $903 $300 Implemented
ME0171 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $587 $300 Implemented
ME0171 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $14,688 $1,600 Implemented
MS0041 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $742 Implemented
MS0041 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $404 $130 Not Implemented
MS0041 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,528 $450 Not Implemented
MS0041 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $251 $160 Implemented
MS0041 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,305 $700 Not Implemented
MS0039 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $624 $321 Implemented
MS0039 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $990 $2,930 Not Implemented
MS0039 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,508 $10,000 Implemented
MS0039 # 04 Y:1995 04 1995 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $3,551 $16,800 Not Implemented
MS0039 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $434 $260 Implemented
MS0039 # 06 Y:1995 06 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,365 $3,000 Implemented
ME0169 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,514 $27,280 Not Implemented
ME0169 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,341 $28,606 Not Implemented
ME0169 # 03 Y:1995 03 1995 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $18,499 $75,000 Not Implemented
ME0169 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,642 $1,200 Not Implemented
ME0169 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,475 $1,000 Not Implemented
ME0169 # 06 Y:1995 06 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,205 $400 Implemented
ME0169 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,520 $0 Not Implemented
ME0169 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $1,000 Implemented