Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
468
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0188 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,106 | $500 | Implemented |
NC0188 # 06 Y:2000 | 06 | 2000 | INSTALL COMMON HEADER ON COMPRESSORS | $15,323 | $2,200 | Not Implemented |
NC0188 # 07 Y:2000 | 07 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $3,120 | $0 | Implemented |
NC0188 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,287 | $960 | Not Implemented |
TN0652 # 01 Y:1999 | 01 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $189,625 | $28,000 | Implemented |
TN0652 # 02 Y:1999 | 02 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $34,710 | $27,240 | Not Implemented |
TN0652 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $23,000 | $60,500 | Implemented |
TN0652 # 04 Y:1999 | 04 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $18,000 | $49,200 | Implemented |
TN0652 # 05 Y:1999 | 05 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,625 | $16,000 | Implemented |
TN0652 # 06 Y:1999 | 06 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $4,000 | $100 | Implemented |
TN0652 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $4,000 | Implemented |
TN0652 # 08 Y:1999 | 08 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $96,250 | $400,000 | Not Implemented |
TN0652 # 09 Y:1999 | 09 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $28,970 | $300 | Not Implemented |
TN0652 # 10 Y:1999 | 10 | 1999 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,210 | $10,000 | Not Implemented |
NC0161 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,160 | $500 | Not Implemented |
NC0161 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,328 | $20 | Not Implemented |
NC0161 # 03 Y:1999 | 03 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,140 | $1,650 | Implemented |
NC0161 # 04 Y:1999 | 04 | 1999 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $160,533 | $279,000 | Not Implemented |
NC0161 # 05 Y:1999 | 05 | 1999 | BURN WASTE PAPER FOR HEAT | $281 | $0 | Not Implemented |
NC0159 # 01 Y:1999 | 01 | 1999 | DISCONNECT BALLASTS | $5,744 | $100 | Implemented |
NC0159 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,313 | $600 | Implemented |
NC0159 # 03 Y:1999 | 03 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,403 | $0 | Not Implemented |
NC0159 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,446 | $1,700 | Not Implemented |
NC0159 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,243 | $1,500 | Not Implemented |
NC0159 # 06 Y:1999 | 06 | 1999 | HEAT WATER WITH EXHAUST HEAT | $1,789 | $2,000 | Implemented |