IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0463 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $11,920 $12,595 Not Implemented
WI0463 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,859 $29,148 Not Implemented
WI0463 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,360 $2,000 Not Implemented
WI0463 # 02 Y:2004 02 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,690 $17,690 Not Implemented
WI0463 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,605 $840 Not Implemented
WI0463 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $75,927 $18,500 Not Implemented
WI0431 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,532 $5,000 Not Implemented
WI0431 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $623 $300 Not Implemented
WI0431 # 06 Y:2002 06 2002 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $369 $525 Not Implemented
WI0431 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
WI0431 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $254 $90 Implemented
WI0431 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,742 $600 Implemented
WI0431 # 01 Y:2002 01 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,907 $13,000 Not Implemented
WI0431 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $282 $640 Implemented
WI0410 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,255 $7,140 Not Implemented
WI0410 # 01 Y:2002 01 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,178 $4,800 Implemented
WI0410 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $942 $740 Implemented
WI0410 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,885 $20,800 Not Implemented
WI0410 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,395 $600 Implemented
WI0410 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,015 $1,657 Implemented
WI0410 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,636 $1,050 Not Implemented
WI0410 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,443 $0 Not Implemented
WI0385 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $6,986 Not Implemented
WI0385 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $60 Implemented
WI0385 # 06 Y:2000 06 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,665 $1,000 Not Implemented