IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0132 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $702 $190 Not Implemented
OD0132 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,459 $0 Not Implemented
TN0600 # 01 Y:1997 01 1997 MODIFY CURRENT INCENTIVE PROGRAM $105,000 $10,000 Not Implemented
TN0600 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $62,970 $9,000 Implemented
TN0600 # 03 Y:1997 03 1997 ELIMINATE THIRD SHIFT $20,340 $4,000 Implemented
TN0600 # 04 Y:1997 04 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,580 $0 Not Implemented
TN0600 # 05 Y:1997 05 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,100 $3,775 Not Implemented
TN0600 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,925 $6,000 Not Implemented
TN0600 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $3,140 $410 Not Implemented
TN0600 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $2,500 $5,675 Implemented
TN0600 # 09 Y:1997 09 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,360 $2,590 Implemented
TN0600 # 10 Y:1997 10 1997 INSTALL TIMERS AND/OR THERMOSTATS $985 $535 Not Implemented
NC0008 # 08 Y:1993 08 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,691 $150 Implemented
NC0008 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,260 $12,244 Implemented
NC0008 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,395 $2,500 Not Implemented
NC0008 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,196 $180 Implemented
NC0008 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,237 $750 Not Implemented
NC0008 # 02 Y:1993 02 1993 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,254 $3,500 Not Implemented
NC0008 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,091 $13,201 Implemented
NC0008 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,736 $13,007 Implemented
NC0008 # 09 Y:1993 09 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $347 $330 Not Implemented
TN0382 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $354 $900 Implemented
TN0382 # 11 Y:1989 11 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $137 $490 Implemented
TN0382 # 10 Y:1989 10 1989 DISCONNECT BALLASTS $137 $221 Implemented
TN0382 # 08 Y:1989 08 1989 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $115 $600 Implemented