Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0227 # 13 Y:2001 13 2001 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $8,933 $10,067 Implemented
NC0227 # 14 Y:2001 14 2001 CONDENSE OPERATION INTO ONE BUILDING $279,320 $500,000 Implemented
NC0227 # 15 Y:2001 15 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $23,716 $15,000 Not Implemented
UU0004 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,903 $875 Implemented
UU0004 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,988 $6,235 Not Implemented
UU0004 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,095 $21,780 Not Implemented
UU0004 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,328 $2,000 Not Implemented
UU0004 # 05 Y:2001 05 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,494 $0 Implemented
UU0004 # 06 Y:2001 06 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $57,120 $1,200 Not Implemented
SF0225 # 01 Y:2001 01 2001 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $2,925 $0 Implemented
SF0225 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,216 $112 Implemented
SF0225 # 03 Y:2001 03 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,948 $2,195 Implemented
SF0225 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,618 $4,030 Not Implemented
SF0225 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $7,920 $14,210 Not Implemented
SF0225 # 06 Y:2001 06 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $897 $2,040 Not Implemented
SF0225 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $230 $618 Not Implemented
UF0282 # 01 Y:2001 01 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,113 $50 Implemented
UF0282 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,296 $28,400 Not Implemented
UF0282 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $32,895 $49,350 Not Implemented
UF0282 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $942 $2,000 Not Implemented
UF0282 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,343 $340 Implemented
UF0282 # 06 Y:2001 06 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,986 $9,000 Implemented
UF0282 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $682 $1,895 Not Implemented
UF0282 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $78,000 $98,800 Not Implemented
UF0282 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $35,100 $4,494 Implemented