IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0385 # 03 Y:2000 03 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $15,000 $10,000 Implemented
WI0385 # 04 Y:2000 04 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,415 $0 Not Implemented
WI0385 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $5,954 $1,200 Not Implemented
WI0385 # 06 Y:2000 06 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,665 $1,000 Not Implemented
WI0385 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $60 Implemented
WI0385 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $404 $740 Not Implemented
WI0385 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $6,986 Not Implemented
WI0385 # 10 Y:2000 10 2000 RECOVER WASTE HEAT FROM EQUIPMENT $459 $2,000 Not Implemented
WI0385 # 11 Y:2000 11 2000 REDUCE VENTILATION AIR $436 $1,000 Not Implemented
WI0385 # 12 Y:2000 12 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $167 $245 Not Implemented
KU0551 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,821 $18,000 Not Implemented
KU0551 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $60 Not Implemented
KU0551 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,370 $890 Not Implemented
KU0551 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $827 $700 Not Implemented
KU0551 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $26,760 $37,200 Not Implemented
MS0171 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $162 $364 n/a
MS0171 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,812 $1,207 n/a
MS0171 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,243 $827 n/a
MS0171 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,198 $228 n/a
MS0171 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,474 $697 n/a
MS0171 # 06 Y:2000 06 2000 IMPROVE SPACE COMFORT CONDITIONING $64,866 $23,339 n/a
MS0170 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $504 Implemented
MS0170 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,522 $296 Implemented
MS0170 # 03 Y:2000 03 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,773 $41,847 Implemented
HO0237 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,410 $11,135 Not Implemented