IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0211 # 04 Y:1997 04 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,328 $90 Not Implemented
AS0211 # 05 Y:1997 05 1997 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,776 $2,985 Not Implemented
AS0211 # 06 Y:1997 06 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,316 $8,000 Not Implemented
AS0211 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $659 $1,981 Not Implemented
AS0211 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $326 $60 Not Implemented
AS0211 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $750 $30 Not Implemented
AS0211 # 10 Y:1997 10 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,840 $60 Not Implemented
AS0211 # 11 Y:1997 11 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $648 $30 Not Implemented
AS0210 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $2,051 n/a
AS0210 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $562 $1,050 n/a
AS0210 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,457 $90 n/a
AS0210 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $620 n/a
AS0210 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,173 $4,099 n/a
AS0210 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,327 $60 n/a
AS0210 # 07 Y:1997 07 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,113 $30 n/a
AS0210 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,080 $30 n/a
AS0210 # 09 Y:1997 09 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $942 $135 n/a
AS0210 # 10 Y:1997 10 1997 PAY UTILITY BILLS ON TIME $934 $0 n/a
OR0303 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,120 $250 Implemented
OR0303 # 02 Y:1997 02 1997 UPGRADE CONTROLS ON COMPRESSORS $3,730 $1,300 Implemented
OR0303 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490 $1,000 Implemented
OR0303 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $606 $2,109 Implemented
OR0303 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,030 $1,400 Implemented
OR0303 # 06 Y:1997 06 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $34,750 $69,300 Implemented
MS0095 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $26,582 $9,750 Implemented