Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,564
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0289 # 02 Y:1997 | 02 | 1997 | ADOPT IN-HOUSE MATERIAL GENERATION | $12,690 | $0 | Implemented |
WI0289 # 03 Y:1997 | 03 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,496 | $11,150 | Not Implemented |
WI0289 # 04 Y:1997 | 04 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,349 | $22,000 | Not Implemented |
WI0289 # 05 Y:1997 | 05 | 1997 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $6,780 | $34,425 | Not Implemented |
WI0289 # 06 Y:1997 | 06 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,430 | $0 | Implemented |
WI0289 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,219 | $150 | Implemented |
WI0289 # 08 Y:1997 | 08 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,588 | $640 | Not Implemented |
WI0289 # 09 Y:1997 | 09 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,541 | $5,000 | Implemented |
WI0288 # 01 Y:1997 | 01 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $5,567 | $500 | Implemented |
WI0288 # 02 Y:1997 | 02 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,058 | $0 | Implemented |
WI0288 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,683 | $7,800 | Not Implemented |
WI0288 # 04 Y:1997 | 04 | 1997 | USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS | $1,240 | $1,000 | Not Implemented |
WI0288 # 05 Y:1997 | 05 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,064 | $640 | Not Implemented |
WI0288 # 06 Y:1997 | 06 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,008 | $5,000 | Implemented |
WI0288 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $183 | $455 | Implemented |
BD0077 # 01 Y:1997 | 01 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,704 | $4,000 | Not Implemented |
BD0077 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,964 | $10,588 | Implemented |
BD0077 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $2,534 | $2,745 | Not Implemented |
BD0077 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,692 | $6,230 | Implemented |
BD0077 # 05 Y:1997 | 05 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,892 | $2,500 | Implemented |
BD0077 # 06 Y:1997 | 06 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $67,324 | $16,500 | Not Implemented |
BD0077 # 07 Y:1997 | 07 | 1997 | REDUCE SCRAP PRODUCTION | $46,525 | $4,500 | Implemented |
BD0077 # 08 Y:1997 | 08 | 1997 | MINIMIZE WATER USAGE | $1,091 | $2,250 | Not Implemented |
BD0077 # 09 Y:1997 | 09 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $20,355 | $0 | Not Implemented |
TN0600 # 01 Y:1997 | 01 | 1997 | MODIFY CURRENT INCENTIVE PROGRAM | $105,000 | $10,000 | Not Implemented |