Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
220
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0040 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,161 | $288,868 | n/a |
CI0040 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $34,278 | $75,000 | n/a |
CI0040 # 07 Y:2024 | 07 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,874 | $7,990 | n/a |
CI0040 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,911 | $6,699 | n/a |
CI0040 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,951 | $31,000 | n/a |
CI0040 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $7,997 | $19,000 | n/a |
CI0040 # 05 Y:2024 | 05 | 2024 | USE PHOTOCELL CONTROLS | $5,246 | $7,920 | n/a |
SD0620 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,249 | $18,262 | Implemented |
SD0620 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,884 | $40,350 | Implemented |
SD0620 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,133 | $1,050 | Implemented |
SF0521 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,001 | $1,610 | Implemented |
SF0521 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $130 | $44 | Implemented |
SF0521 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,084 | $2,146 | Implemented |
SF0521 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,444 | $3,798 | Implemented |
SF0521 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,634 | $44,294 | Implemented |
SF0521 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,270 | $22,190 | Implemented |
SF0521 # 08 Y:2018 | 08 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,006 | $487,058 | Implemented |
SF0521 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,263 | $61,175 | Implemented |
SD0546 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,431 | $6,068 | Implemented |
SD0546 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,299 | $2,500 | Implemented |
SD0546 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $419 | $1,000 | Implemented |
SD0546 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $989 | $400 | Implemented |
SD0546 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,392 | $25,659 | Implemented |
SD0546 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $8,753 | $17,253 | Implemented |
SD0542 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,162 | $600 | Not Implemented |