Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0496 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $0 | Not Implemented |
CO0496 # 06 Y:2001 | 06 | 2001 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $68,550 | $3,360 | Not Implemented |
CO0496 # 07 Y:2001 | 07 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $12,610 | $0 | Not Implemented |
CO0496 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $104,330 | $20,000 | Not Implemented |
CO0496 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,240 | $220 | Not Implemented |
CO0496 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,120 | $12,000 | Not Implemented |
CO0496 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,560 | $5,260 | Not Implemented |
AS0313 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $311 | $1,254 | Implemented |
AS0313 # 09 Y:2001 | 09 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $49,133 | $8,028 | Implemented |
AS0313 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,708 | $735 | Not Implemented |
AS0313 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $71 | $225 | Not Implemented |
AS0313 # 06 Y:2001 | 06 | 2001 | INSTALL SKYLIGHTS | $1,042 | $8,108 | Not Implemented |
AS0313 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,639 | $24,888 | Implemented |
AS0313 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,661 | $180 | Implemented |
AS0313 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,929 | $31,000 | Not Implemented |
AS0313 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,092 | $1,500 | Implemented |
NC0227 # 12 Y:2001 | 12 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $824 | $1,210 | Implemented |
NC0227 # 11 Y:2001 | 11 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,277 | $2,690 | Not Implemented |
NC0227 # 10 Y:2001 | 10 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $2,636 | $4,205 | Implemented |
NC0227 # 08 Y:2001 | 08 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,500 | $5,000 | Not Implemented |
NC0227 # 07 Y:2001 | 07 | 2001 | CONTROL PRESSURE ON STEAMER OPERATIONS | $7,356 | $7,500 | Implemented |
NC0227 # 06 Y:2001 | 06 | 2001 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $200,000 | $35,000 | Not Implemented |
NC0227 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,391 | $250 | Not Implemented |
NC0227 # 15 Y:2001 | 15 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $23,716 | $15,000 | Not Implemented |
NC0227 # 14 Y:2001 | 14 | 2001 | CONDENSE OPERATION INTO ONE BUILDING | $279,320 | $500,000 | Implemented |