IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 251 Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0551 # 04 Y:1998 04 1998 $1,083 $225 Implemented
UD0551 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $7,000 Not Implemented
UD0551 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,897 $10,073 Implemented
UD0551 # 01 Y:1998 01 1998 $42,000 $2,400 Not Implemented
UD0442 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $8,910 $10,000 Implemented
UD0442 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $6,200 Implemented
UD0442 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,818 $3,360 Implemented
UD0442 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,118 $1,000 Implemented
UD0442 # 02 Y:1994 02 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,335 $0 Not Implemented
UD0442 # 01 Y:1994 01 1994 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $3,914 $0 Implemented
UD0363 # 01 Y:1992 01 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,743 $40,000 Implemented
UD0363 # 03 Y:1992 03 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $0 Implemented
UD0363 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $955 $240 Implemented
UD0163 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $17,374 $7,500 Implemented
UD0163 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $16,003 $2,000 Implemented
UD0163 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $22,293 $19,340 Not Implemented
UD0163 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $2,300 Implemented
UD0163 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,556 $0 Implemented
UD0163 # 01 Y:1985 01 1985 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,896 $40,000 Not Implemented
UD0118 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,598 $126,000 Not Implemented
UD0118 # 03 Y:1984 03 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,044 $0 Not Implemented
UD0118 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,336 $335 Implemented
UD0118 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,495 $0 Implemented
UD0066 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,419 $2,525 Implemented
UD0066 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $769 $0 Implemented