IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

282

matching recommendations
Reset
SIC 252 Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0170 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,522 $296 Implemented
MS0170 # 03 Y:2000 03 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,773 $41,847 Implemented
AR0191 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $1,877 Implemented
AR0191 # 04 Y:2000 04 2000 USE MAGNETIC TECHNOLOGY TO TREAT WATER $12,000 $10,374 Implemented
AR0191 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $95,071 $13,210 Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
MS0166 # 01 Y:2000 01 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $190 $70 Implemented
AR0186 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,117 $23,976 Implemented
AR0186 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,663 $54,855 Implemented
MS0160 # 02 Y:2000 02 2000 USE SYNTHETIC LUBRICANT $1,840 $1,210 Implemented
WI0336 # 02 Y:1999 02 1999 LEASE EQUIPMENT INSTEAD OF PURCHASING $22,800 $0 Implemented
WI0336 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,499 $0 Implemented
WI0337 # 03 Y:1999 03 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $5,222 $5,700 Implemented
WI0337 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $0 Implemented
WI0337 # 08 Y:1999 08 1999 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $990 $5,024 Implemented
WI0337 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $640 Implemented
AR0152 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $210 Implemented
AR0152 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $755 $0 Implemented
AR0152 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,840 $240 Implemented
AR0152 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,507 $125 Implemented
MS0104 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,476 $54 Implemented
MS0104 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $5,872 $12,115 Implemented
MS0104 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $0 Implemented
MS0104 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,962 $27,800 Implemented