IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2521 Wood Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0620 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,884 $40,350 Implemented
SD0620 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,249 $18,262 Implemented
SD0620 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,133 $1,050 Implemented
NC0657 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $194 $493 Implemented
NC0657 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,082 $5,265 Implemented
CL1809 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,602 $11,662 Implemented
CL1809 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,846 $250 Implemented
SF0521 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,270 $22,190 Implemented
SF0521 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,084 $2,146 Implemented
SF0521 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,263 $61,175 Implemented
SF0521 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,001 $1,610 Implemented
SF0521 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $94,006 $487,058 Implemented
SF0521 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,634 $44,294 Implemented
SF0521 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $44 Implemented
SF0521 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,444 $3,798 Implemented
NC0607 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,097 $5,865 Implemented
NC0607 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $468 $1,500 Implemented
NC0607 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $1,000 Implemented
NC0607 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,655 $10,125 Implemented
NC0607 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $200 Implemented
NC0607 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $436 $797 Implemented
NC0591 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,501 $4,590 Implemented
NC0591 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,408 $87,579 Implemented
NC0591 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
NC0591 # 04 Y:2017 04 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,474 $24,000 Implemented