IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
SIC 2522 Office Furniture, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0005 # 02 Y:2007 02 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $167,986 $65,000 Implemented
DL0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,373 $0 Implemented
MA0615 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,050 $100,800 Not Implemented
MA0615 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $3,200 Implemented
MA0615 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $4,673 $18,500 Implemented
MA0615 # 08 Y:2007 08 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,499 $15,500 Not Implemented
MA0615 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $8,155 $0 Implemented
MA0615 # 06 Y:2007 06 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,518 $13,000 Implemented
MA0615 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,214 $800 Implemented
MA0615 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,125 $0 Implemented
MA0615 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,561 $53,848 Not Implemented
MA0615 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,604 $84,300 Implemented
MS0228 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,861 $6,210 Not Implemented
MS0228 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $276 Implemented
MS0228 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,499 $2,540 Implemented
MS0228 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,237 $1,210 Not Implemented
MS0228 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $90 $157 Not Implemented
MS0228 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $323 $0 Implemented
CO0496 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $68,550 $3,360 Not Implemented
CO0496 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,120 $12,000 Not Implemented
CO0496 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $104,330 $20,000 Not Implemented
CO0496 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $5,260 Not Implemented
CO0496 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,240 $220 Not Implemented
CO0496 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0496 # 07 Y:2001 07 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $12,610 $0 Not Implemented