IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 254 Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1088 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
UD1088 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,165 $953 Implemented
UD0759 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $500 Implemented
UD0759 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,130 $0 Implemented
UD0759 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,675 $0 Implemented
UD0759 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,276 $0 Implemented
UD0759 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $0 Implemented
UD0654 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $0 Implemented
UD0654 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $415 $200 Implemented
UD0385 # 05 Y:1992 05 1992 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $12,716 $3,428 Implemented
UD0385 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $4,026 $3,294 Implemented
UD0385 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,703 $0 Implemented
UD0385 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,747 $60,000 Implemented
UD0385 # 06 Y:1992 06 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,807 $2,200 Implemented
UD0277 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,698 $500 Implemented
UD0277 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,053 $250 Implemented
UD0277 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,413 $1,125 Implemented
UD0277 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,165 $1,500 Implemented
UD0277 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $746 $1,500 Implemented
UD0277 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,464 $5,850 Implemented
UD0202 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,504 $80 Implemented
UD0202 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,636 $791 Implemented
UD0202 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,955 $0 Implemented
UD0202 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,318 $0 Implemented
UD0093 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,042 $5,758 Implemented