IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

613

matching recommendations
Reset
SIC 254 Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0450 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $1,004 $2,184 Not Implemented
KU0450 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $990 $3,850 Not Implemented
KU0450 # 11 Y:1995 11 1995 OPTIMIZE PLANT POWER FACTOR $2,417 $4,200 Not Implemented
KU0450 # 12 Y:1995 12 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $984 $150 Implemented
WI0205 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,212 $11,695 Implemented
WI0205 # 02 Y:1994 02 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,751 $15,000 Not Implemented
WI0205 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,651 $0 Not Implemented
WI0205 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $578 $1,000 Not Implemented
WI0205 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,492 Implemented
WI0205 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,578 $0 Implemented
WI0205 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $961 $450 Implemented
WI0205 # 08 Y:1994 08 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,321 $0 Not Implemented
WI0205 # 09 Y:1994 09 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,074 $500 Implemented
WI0205 # 10 Y:1994 10 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,362 $800 Implemented
WI0205 # 11 Y:1994 11 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $977 $500 Implemented
WI0205 # 12 Y:1994 12 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,370 $10,000 Not Implemented
AR0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,614 $2,225 Implemented
AR0011 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,006 $1,690 Not Implemented
AR0011 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,990 $250 Implemented
AR0011 # 04 Y:1993 04 1993 REDESIGN PROCESS $50,000 $145,000 Not Implemented
AR0011 # 05 Y:1993 05 1993 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,207 $1,000 Not Implemented
HO0059 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $3,334 Not Implemented
HO0059 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,051 $3,337 Not Implemented
HO0059 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $740 $1,134 Not Implemented
HO0059 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $130 $112 Not Implemented