IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

613

matching recommendations
Reset
SIC 254 Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0500 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $286 $750 Not Implemented
NC0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,389 $7,000 Implemented
NC0500 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $875 Implemented
NC0500 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,293 $125 Implemented
NC0500 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $100 Implemented
NC0500 # 04 Y:2013 04 2013 REDUCE FLUID FLOW RATES $34,287 $18,000 Implemented
NC0500 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $4,146 $200 Implemented
NC0500 # 02 Y:2013 02 2013 MAKE A NEW BY-PRODUCT $86,815 $250,000 Implemented
NC0500 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $59,689 $250,000 Not Implemented
SD0507 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $983 Implemented
SD0507 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,758 $7,385 Not Implemented
SD0507 # 04 Y:2011 04 2011 INSULATE FEEDWATER TANK $443 $400 Not Implemented
SD0507 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,820 $2,500 Not Implemented
SD0507 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,615 $5,000 Not Implemented
SD0507 # 01 Y:2011 01 2011 USE PHOTOCELL CONTROLS $152 $0 Implemented
BD0380 # 08 Y:2010 08 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,554 $2,750 Not Implemented
BD0380 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $748 $21 Not Implemented
BD0380 # 06 Y:2010 06 2010 USE SYNTHETIC LUBRICANT $873 $600 Not Implemented
BD0380 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,119 $1,500 Not Implemented
BD0380 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,681 $420 Not Implemented
BD0380 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,388 $3,780 Not Implemented
BD0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $15,800 $18,200 Not Implemented
BD0380 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,928 $11 Implemented
CO0628 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,830 $890 Implemented
CO0628 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,050 $1,730 Implemented