Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2541 Wood Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0402 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,970 $20,000 Not Implemented
CO0402 # 07 Y:1997 07 1997 ADD ADDITIONAL PRODUCTION SHIFT $35,580 $730 Not Implemented
CO0402 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $995 Not Implemented
CO0402 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $2,920 Not Implemented
CO0402 # 03 Y:1997 03 1997 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,180 $1,000 Not Implemented
CO0402 # 04 Y:1997 04 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $930 $0 Not Implemented
CO0402 # 05 Y:1997 05 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $970 $0 Not Implemented
CO0402 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $360 $0 Not Implemented
WI0288 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $455 Implemented
WI0288 # 06 Y:1997 06 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,008 $5,000 Implemented
WI0288 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $640 Not Implemented
WI0288 # 04 Y:1997 04 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $1,240 $1,000 Not Implemented
WI0288 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,683 $7,800 Not Implemented
WI0288 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,058 $0 Implemented
WI0288 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,567 $500 Implemented
BD0077 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $20,355 $0 Not Implemented
BD0077 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $1,091 $2,250 Not Implemented
BD0077 # 07 Y:1997 07 1997 REDUCE SCRAP PRODUCTION $46,525 $4,500 Implemented
BD0077 # 06 Y:1997 06 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $67,324 $16,500 Not Implemented
BD0077 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,892 $2,500 Implemented
BD0077 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,692 $6,230 Implemented
BD0077 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $2,534 $2,745 Not Implemented
BD0077 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,964 $10,588 Implemented
BD0077 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $13,704 $4,000 Not Implemented