IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
SIC 2599 Furniture And Fixtures, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0008 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,703 $0 Implemented
UM0382 # 07 Y:2011 07 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,797 $31,000 Not Implemented
UM0382 # 06 Y:2011 06 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $17,682 $21,309 Not Implemented
UM0382 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,115 $2,800 Not Implemented
UM0382 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,843 $2,200 Not Implemented
UM0382 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,453 $1,000 Not Implemented
UM0382 # 02 Y:2011 02 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $87 $10 Not Implemented
UM0382 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $252 $1,000 Not Implemented
OK0774 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $365 $1,154 Implemented
OK0774 # 06 Y:2009 06 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $400 $0 Not Implemented
OK0774 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $5,760 Not Implemented
OK0774 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,891 Not Implemented
OK0774 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $0 Implemented
OK0774 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $607 $1,902 Not Implemented
SD0374 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,927 $7,500 Implemented
SD0374 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,046 $52,243 Implemented
SD0374 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $350 Implemented
SD0374 # 05 Y:2005 05 2005 COVER OPEN TANKS $2,000 $4,500 Not Implemented
SD0374 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,982 $220 Implemented
SD0374 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,769 $140 Implemented
SD0374 # 01 Y:2005 01 2005 INSTALL AN UNINTERUPTABLE POWER SUPPLY $27,800 $0 Not Implemented
BD0290 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,841 $9,598 Implemented
BD0290 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,277 $15,080 Implemented
BD0290 # 15 Y:2005 15 2005 METER WASTE WATER $728 $250 Implemented
BD0290 # 14 Y:2005 14 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $406 $450 Implemented