IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0300 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,824 $30 Implemented
AS0300 # 05 Y:2001 05 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $815,625 $640 Implemented
IA0266 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,737 $0 Implemented
IA0266 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,175 $11,846 Implemented
IA0266 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $2,034 $1,663 Implemented
IA0266 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,027 $518 Implemented
IA0266 # 10 Y:2001 10 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $585 Implemented
IA0266 # 11 Y:2001 11 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,767 $2,000 Implemented
IA0266 # 13 Y:2001 13 2001 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $231,300 $0 Implemented
WI0400 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $640 Implemented
WI0400 # 09 Y:2001 09 2001 INSTALL TIMERS AND/OR THERMOSTATS $209 $400 Implemented
TA0009 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $480 Implemented
TA0009 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $0 Implemented
TA0009 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $233 $0 Implemented
TA0009 # 06 Y:2001 06 2001 USE POWER DURING OFF-PEAK PERIODS $210 $0 Implemented
UM0187 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,181 $375 Implemented
UM0187 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,688 Implemented
LL0107 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,897 $0 Implemented
LL0107 # 04 Y:2001 04 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,407 $0 Implemented
LL0107 # 05 Y:2001 05 2001 RECYCLE WHITE WATER $25,896 $175,000 Implemented
MA0484 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,500 $9,500 Implemented
MA0484 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,300 $12,000 Implemented
MA0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $51,800 Implemented
MA0484 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $0 Implemented
MA0484 # 09 Y:2001 09 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Implemented