IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0064 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,612 $0 Implemented
MZ0064 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,258 $1,800 Implemented
MZ0064 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,520 $8,600 Implemented
MZ0064 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $12,142 $3,680 Implemented
MZ0064 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,225 $57,800 Implemented
MZ0064 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,083 $6,900 Implemented
OK0810 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,840 $11,400 Implemented
OK0810 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,317 $0 Implemented
OK0808 # 06 Y:2011 06 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $27,934 $5,125 Implemented
OK0808 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,547 $17,879 Implemented
OK0808 # 02 Y:2011 02 2011 USE POWER DURING OFF-PEAK PERIODS $19,801 $226 Implemented
OK0808 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,907 $5,105 Implemented
OK0797 # 11 Y:2010 11 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $51,080 $1,032,424 Implemented
OK0797 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,987 $1,500 Implemented
OK0797 # 10 Y:2010 10 2010 INSTALL REPLACEMENT DOORS $597 $3,114 Implemented
OK0797 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $260 $0 Implemented
LL0333 # 01 Y:2010 01 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,585,020 $273,500 Implemented
LL0333 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,966 $5,315 Implemented
LL0333 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $288,465 $36,500 Implemented
OK0732 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $1,065 Implemented
OK0732 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,627 $3,627 Implemented
OK0732 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,149 $2,491 Implemented
OK0732 # 03 Y:2006 03 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,843 $17,500 Implemented
OK0732 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $1,241 Implemented
OK0732 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,602 $1,223 Implemented