Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
371
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0829 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,700 | $4,400 | Implemented |
MA0829 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $6,782 | $8,620 | Not Implemented |
MA0829 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,485 | $1,000 | Not Implemented |
MA0829 # 06 Y:2022 | 06 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,891 | $4,445 | Implemented |
MA0829 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,736 | $24,400 | Not Implemented |
MA0829 # 07 Y:2022 | 07 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,594 | $5,100 | Implemented |
MA0829 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,278 | $15,850 | Not Implemented |
MA0828 # 02 Y:2022 | 02 | 2022 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $127,245 | $144,842 | Not Implemented |
MA0828 # 01 Y:2022 | 01 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $443,207 | $3,043,367 | Not Implemented |
MA0828 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $522 | $910 | Not Implemented |
MA0828 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,386 | $12,000 | Not Implemented |
MA0828 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $64,198 | $280,195 | Not Implemented |
MA0828 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,256 | $3,515 | Not Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
MA0819 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,721 | $2,930 | Not Implemented |
MA0819 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,315 | $92,400 | Not Implemented |
MA0819 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,833 | $1,000 | Not Implemented |
MA0801 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,653 | $8,930 | Not Implemented |
MA0801 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,364 | $4,110 | Not Implemented |
MA0801 # 02 Y:2019 | 02 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,204 | $200 | Not Implemented |
MA0801 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,210 | $2,397 | Not Implemented |
MA0801 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,249 | $1,250 | Not Implemented |
MA0801 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $416,385 | $525,000 | Not Implemented |
MA0792 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,744 | $3,340 | Not Implemented |
MA0792 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,711 | $9,925 | Implemented |