IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0320 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $880 $1,320 Not Implemented
SF0320 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $1,799 $3,725 Not Implemented
SF0320 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,670 $30,700 Not Implemented
LE0227 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,579 $40,000 Not Implemented
LE0227 # 02 Y:2006 02 2006 REPLACE BOILER $39,147 $143,000 Not Implemented
LE0227 # 03 Y:2006 03 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $18,895 $42,000 Not Implemented
LE0227 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,727 $1,000 Not Implemented
LE0227 # 05 Y:2006 05 2006 INSTALL BACK-UP EQUIPMENT $8,000 $7,900 Not Implemented
LE0227 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,005 $500 Not Implemented
LE0227 # 07 Y:2006 07 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,617 $1,200 Not Implemented
UU0097 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $58,512 $25,405 Not Implemented
UU0097 # 02 Y:2006 02 2006 INSTALL AN UNINTERUPTABLE POWER SUPPLY $177,372 $808,858 Not Implemented
UU0097 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,790 $2,000 Not Implemented
UU0097 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,461 $4,840 Not Implemented
UU0097 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,191 $740 Not Implemented
UU0097 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $2,770 $1,500 Not Implemented
UU0097 # 07 Y:2006 07 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,960 $2,900 Not Implemented
UU0097 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,113 $3,570 Not Implemented
UU0097 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $71,588 $180,000 Not Implemented
AM0501 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $13,010 $390 Implemented
AM0501 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,130 $105 Implemented
AM0501 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $6,380 Not Implemented
AM0501 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,370 $500 Implemented
AM0501 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $1,000 Implemented
AM0501 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $650 $0 Not Implemented