IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0738 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $6,268 Implemented
GT0738 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,887 $4,500 Implemented
GT0738 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,145 $2,556 Implemented
GT0738 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $2,250 Implemented
GT0738 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,705 $0 Implemented
GT0738 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,769 $31,236 Implemented
NC0248 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,487 $1,000 Not Implemented
NC0248 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,087 $0 Not Implemented
NC0248 # 03 Y:2002 03 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,379 $7,882 Implemented
NC0248 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $2,115 $1,075 Implemented
NC0248 # 05 Y:2002 05 2002 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,743 $40,000 Implemented
NC0248 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $982 $1,936 Implemented
NC0248 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $196 $334 Implemented
IA0299 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $367 Not Implemented
IA0299 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $4,498 Not Implemented
IA0299 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $151 $266 Not Implemented
IA0299 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $2,000 $2,694 Not Implemented
IA0299 # 06 Y:2002 06 2002 ISOLATE HOT OR COLD EQUIPMENT $578 $446 Not Implemented
IA0299 # 07 Y:2002 07 2002 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,388 $3,000 Implemented
IA0299 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $433 $19 Implemented
SU0140 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $593,735 $5,128,500 Not Implemented
SU0140 # 02 Y:2002 02 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $392,475 $730,000 Not Implemented
SU0140 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $147,968 $19,500 Not Implemented
SU0140 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,283 $64,018 Implemented
SU0140 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,631 $14,250 Implemented