IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0249 # 13 Y:2002 13 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $67,320 $55,000 Not Implemented
WV0247 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,727 $80 Implemented
WV0247 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,090 $296 Not Implemented
WV0247 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,600 $0 Implemented
WV0247 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,412 $2,100 Implemented
WV0247 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $5,402 $305 Implemented
WV0247 # 07 Y:2002 07 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,312 $400 Implemented
WV0247 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,554 $970 Implemented
WV0247 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $2,010 Implemented
WV0247 # 10 Y:2002 10 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,136 $2,744 Not Implemented
WV0247 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $396 $956 Not Implemented
WV0247 # 12 Y:2002 12 2002 RECOVER AND REUSE COOLING WATER $14,103 $7,000 Not Implemented
WV0247 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
WV0247 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,772 $1,000 Not Implemented
LL0147 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,887 $1,500 Implemented
LL0147 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,034 $0 Not Implemented
LL0147 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $2,355 $421 Implemented
LL0147 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $450 $104 Not Implemented
LL0147 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,126 $0 Not Implemented
OK0642 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,760 $9,780 Implemented
OK0642 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $900 Implemented
OK0642 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,265 $10 Implemented
OK0642 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $15,836 Not Implemented
OK0642 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $711 $450 Not Implemented
OK0642 # 06 Y:2002 06 2002 INSTALL SET-BACK TIMERS $2,130 $332 Implemented