IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0804 # 05 Y:2009 05 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,277 $500 Implemented
UD0804 # 17 Y:2009 17 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $270 $500 Not Implemented
UD0804 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,004 $12,597 Not Implemented
UD0804 # 11 Y:2009 11 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,128 $0 Implemented
UD0804 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $38,869 $12,000 Implemented
UD0804 # 03 Y:2009 03 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $35,001 $9,000 Implemented
SU0285 # 10 Y:2009 10 2009 RECOVER WASTE HEAT FROM EQUIPMENT $53,384 $69,621 Not Implemented
SU0285 # 11 Y:2009 11 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $642 Not Implemented
SU0285 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $183 Not Implemented
SU0285 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $95,326 $0 Implemented
SU0285 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,299 $18,800 Implemented
SU0285 # 06 Y:2009 06 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,595 $25,000 Not Implemented
SU0285 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,090 $460 Implemented
SU0285 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,387 $0 Not Implemented
SU0285 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $4,200 $2,508 Implemented
SU0285 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,684 $0 Implemented
SU0285 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,037 $0 Not Implemented
UW0030 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134,729 $705,718 Not Implemented
UW0030 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $74,218 $166,366 Not Implemented
UW0030 # 02 Y:2009 02 2009 KEEP BOILER TUBES CLEAN $115,460 $50,000 Not Implemented
IC0157 # 12 Y:2009 12 2009 DISCONNECT BALLASTS $4,133 $1,070 Implemented
IC0157 # 09 Y:2009 09 2009 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,416 $210 Not Implemented
IC0157 # 10 Y:2009 10 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,332 $0 Not Implemented
IC0157 # 11 Y:2009 11 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,607 $289,000 Implemented
IC0157 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $769 $470 Not Implemented