Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0452 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $524 | Implemented |
SU0452 # 05 Y:2017 | 05 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $25,555 | $120,000 | Implemented |
OR0688 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,431 | $448 | Implemented |
OR0688 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,221 | $180,000 | Implemented |
OR0688 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,049 | $0 | Not Implemented |
OR0688 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,165 | $0 | Not Implemented |
NL0011 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,874 | $0 | Not Implemented |
NL0011 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,747 | $20,139 | Implemented |
NL0011 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,135 | $1,571 | Not Implemented |
NL0011 # 04 Y:2017 | 04 | 2017 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $982 | $0 | Implemented |
UK1704 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,480 | $18,700 | Implemented |
UK1704 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $15,401 | $43,120 | Implemented |
UK1704 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,970 | $0 | Implemented |
UK1704 # 04 Y:2017 | 04 | 2017 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $36,644 | $16,350 | Not Implemented |
UK1704 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,541 | $0 | Implemented |
UK1704 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,756 | $5,320 | Implemented |
UK1704 # 07 Y:2017 | 07 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,390 | $9,300 | Implemented |
UK1704 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $5,402 | $8,550 | Implemented |
UK1704 # 09 Y:2017 | 09 | 2017 | USE PHOTOCELL CONTROLS | $1,262 | $630 | Not Implemented |
UK1704 # 10 Y:2017 | 10 | 2017 | CLEAN CONDENSER TUBES | $2,467 | $650 | Implemented |
UK1704 # 11 Y:2017 | 11 | 2017 | REDUCE FLUID FLOW RATES | $2,428 | $1,125 | Not Implemented |
UK1704 # 12 Y:2017 | 12 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $292 | $775 | Not Implemented |
LE0434 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,784 | $28 | Implemented |
LE0434 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $1,000 | Not Implemented |
LE0434 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,560 | $1,080 | Implemented |