IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0170 # 08 Y:1985 08 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,764 $700 Implemented
KU0170 # 09 Y:1985 09 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $735 $30 Implemented
KU0170 # 10 Y:1985 10 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $300 Implemented
KU0170 # 11 Y:1985 11 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $147 $20 Implemented
KU0170 # 12 Y:1985 12 1985 INSULATE BARE EQUIPMENT $2,018 $800 Not Implemented
KU0170 # 13 Y:1985 13 1985 REPAIR AND ELIMINATE STEAM LEAKS $1,835 $300 Not Implemented
KU0170 # 14 Y:1985 14 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,514 $1,300 Implemented
KU0170 # 15 Y:1985 15 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $962 $400 Not Implemented
KU0170 # 16 Y:1985 16 1985 INSULATE BARE EQUIPMENT $1,000 $591 Implemented
KU0170 # 17 Y:1985 17 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $551 $0 Implemented
MA0033 # 01 Y:1985 01 1985 SELL COMBUSTIBLE WASTE $71,743 $0 Not Implemented
MA0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,606 $440 Implemented
MA0033 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $9,021 $4,221 Implemented
MA0033 # 04 Y:1985 04 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $11,988 $130 Not Implemented
MA0033 # 05 Y:1985 05 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,483 $1,300 Not Implemented
MA0033 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $47,000 $640 Implemented
MA0033 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,905 $642 Implemented
MA0035 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,472 $33,300 Not Implemented
MA0035 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,444 $795 Implemented
MA0035 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $100 Not Implemented
MA0035 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $8,213 $1,287 Implemented
MA0035 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $913 Not Implemented
MA0035 # 06 Y:1985 06 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,512 $9,450 Not Implemented
LT0026 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,318 $300 Implemented
LT0026 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,870 $11,300 Implemented