IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
UD0155 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,170 $3,800 Implemented
UD0155 # 02 Y:1985 02 1985 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,027 $3,400 Implemented
UD0155 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $947 $483 Implemented
UD0155 # 04 Y:1985 04 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,376 $33,000 Not Implemented
UD0145 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,141 $36,000 Not Implemented
UD0145 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,579 $19,613 Implemented
UD0145 # 03 Y:1984 03 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,148 $17,000 Not Implemented
GT0236 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $49 $0 Implemented
GT0236 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $50 Implemented
GT0236 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,182 $0 Not Implemented
GT0236 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,004 $0 Implemented
GT0236 # 05 Y:1984 05 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,625 $5,000 Not Implemented
GT0236 # 06 Y:1984 06 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $356 $546 Implemented
GT0236 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,323 $2,000 Not Implemented
KU0141 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $11,187 $600 Implemented
KU0141 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,785 $0 Implemented
KU0141 # 03 Y:1984 03 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,773 $14,000 Not Implemented
KU0141 # 04 Y:1984 04 1984 INSTALL SET-BACK TIMERS $1,882 $170 Implemented
KU0141 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,544 $6,000 Not Implemented
KU0141 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $150 Implemented
KU0141 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $753 $1,495 Not Implemented
KU0141 # 08 Y:1984 08 1984 INSULATE BARE EQUIPMENT $371 $150 Not Implemented
KU0141 # 10 Y:1984 10 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $420 $400 Not Implemented