Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
211
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0259 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,423 | $1,500 | Implemented |
UM0259 # 06 Y:2004 | 06 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,375 | $6,500 | Not Implemented |
UM0259 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,545 | $75,000 | Implemented |
UM0259 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,337 | $7,410 | Implemented |
UM0259 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,415 | $11,200 | Implemented |
UM0259 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,534 | $43,000 | Not Implemented |
UM0259 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,040 | $58,000 | Not Implemented |
UM0240 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,440 | $2,500 | Implemented |
UM0240 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,120 | $1,000 | Implemented |
UM0240 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $17,060 | $5,000 | Implemented |
UM0240 # 04 Y:2003 | 04 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,980 | $9,450 | Not Implemented |
UM0240 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $14,410 | $5,000 | Implemented |
UM0240 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,305 | $500 | Implemented |
UM0240 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $6,425 | $414 | Not Implemented |
UM0240 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $9,445 | $2,700 | Not Implemented |
UM0240 # 09 Y:2003 | 09 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,550 | $1,100 | Implemented |
UM0240 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,570 | $4,301 | Not Implemented |
UM0236 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,209 | $500 | Not Implemented |
UM0236 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,379 | $700 | Not Implemented |
UM0236 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,424 | $2,000 | Not Implemented |
UM0236 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,861 | $2,500 | Implemented |
UM0236 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,777 | $2,400 | Not Implemented |
UM0236 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $5,018 | Not Implemented |
UM0211 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,138 | $3,838 | Implemented |
UM0211 # 08 Y:2002 | 08 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $441 | $200 | Not Implemented |